Complete bathroom renovation – from old building to modern bathroom comfort

In this project, we completely renovated an aging bathroom—from gutting to modern redesign.

Step by step:

  1. Demolition work: Removal of the old shower tray, tiles, and the entire floor down to the joists.

  2. Pipe renovation & insulation: Renewal of the pipes, installation of impact sound insulation and thermal insulation.

  3. Substructure & sealing: Construction of a new, stable floor with vapor barrier and professional sealing (Probau system).

  4. Tiling work: Installation of modern, easy-care floor tiles for a bright, clean room atmosphere.

Result:

A fully renewed bathroom with a functional layout, high-quality workmanship, and a fresh shine—ready for many years of comfort and use.